Renovation of ROD switchgears, UPS guaranteed voltage system, integration of existing alarm systems with PLCs and installation of CCTV, replacing a section of overhead and cable line.
Renovation of ROD switchgears, UPS guaranteed voltage system, integration of existing alarm systems with PLCs and installation of CCTV, replacing a section of overhead and cable line.
Comprehensive execution of 110 kV HV cable line. Modernization of HV 110 kV line connections , including the dismantling of existing connections, suspending and connecting new ones between the hydrogenerators and overhead poles, testing and commissioning. Replacing the connections of secondary circuits, along with the modernization of the telecommunications node.
Connecting the wind farm into Enea Operator power grid.
Construction and modernisation of seven 110 kV bays in terms of power-system automation and telemechanics.
Full completion of the wind farm (BoP), including: construction of wind turbine foundations, electrical substation and cable network, building and adjusting local roads, supply and installation of measurement and telecommunication systems for the wind farm.
400 kV power evacuation. Second longest 400 kV cable line in Poland, 400/110 kV and 110/30 kV substations.
General Contractor of the non-interrupted modernisation of the 220/110/20 kV substation involving: production of the execution plan, construction of a three-storey building for the 110 kV switchgear, supply and installation of an indoor 110 kV SF6 insulated power switchgear (17-bay), construction of new high voltage stations at existing linear gates, construction of a surface pipe bridge connecting the new 110 kV switchgear with the 220/110 kV autotransformer, construction of an overhead line bridge to connect the 110 kV switchgear with the 400/110 kV autotransformer, 110 kV cable connections between the bays of the new 110 kV switchgear and the equipment at the linear gates, installation of secondary circuit equipment in the new 110 kV switchgear, erection of an antenna mast, IT connections, facility monitoring and security.
220 kV power evacuation. Longest 220 kV cable line in Poland. 220/110 kV substation and 110/33 kV substation
110/30 kV substation, 110 kV cable line with a detailed construction design of the 110 kV bay in a PGE Dystrybucja S.A. substation.
Full completion of the wind farm (BoP), including: construction of wind turbine foundations, electrical substation and cable network, building and adjusting local roads, supply and installation of measurement and telecommunication systems for the wind farm.