Żydowo pumped storage plant – power output replacement

Comprehensive  execution of 110 kV HV cable line. Modernization of HV 110 kV line connections , including the dismantling of existing connections, suspending and connecting new ones between the hydrogenerators and overhead poles, testing and commissioning. Replacing the connections of secondary circuits, along with the modernization of the telecommunications node.

Topczykały Wind Farm (22,5 MW)

Full completion of the wind farm (BoP), including: construction of wind turbine foundations, electrical substation and cable network, building and adjusting local roads, supply and installation of measurement and telecommunication systems for the wind farm.

 

Korytnica Wind Farm

400 kV power evacuation. Second longest 400 kV cable line in Poland, 400/110 kV and 110/30 kV substations.

 

110 kV switching station of the 220/110/20 kV Substation in Świebodzice (GIS) – modernisation without interruption

General Contractor of the non-interrupted modernisation of the 220/110/20 kV substation involving: production of the execution plan, construction of a three-storey building for the 110 kV switchgear, supply and installation of an indoor 110 kV SF6 insulated power switchgear (17-bay), construction of new high voltage stations at existing linear gates, construction of a surface pipe bridge connecting the new 110 kV switchgear with the 220/110 kV autotransformer, construction of an overhead line bridge to connect the 110 kV switchgear with the 400/110 kV autotransformer, 110 kV cable connections between the bays of the new 110 kV switchgear and the equipment at the linear gates, installation of secondary circuit equipment in the new 110 kV switchgear, erection of an antenna mast, IT connections, facility monitoring and security.

Banie-Kozielice Wind Farm

220 kV power evacuation. Longest 220 kV cable line in Poland. 220/110 kV substation and 110/33 kV substation

Tyszowce Wind Farm

110/30 kV substation, 110 kV cable line with a detailed construction design of the 110 kV bay in a PGE Dystrybucja S.A. substation.

Krywiatycze Wind Farm (15 MW)

Full completion of the wind farm (BoP), including: construction of wind turbine foundations, electrical substation and cable network, building and adjusting local roads, supply and installation of measurement and telecommunication systems for the wind farm.

Skip to content