Tomaszów Wind Farm

110 kV cable line with a detailed construction design of the 110 kV bay in a PGE Dystrybucja S.A. substation.

Suchań Wind Farm

110/20 kV substation and green energy measuring systems in the WTGs.

Skurpie Wind Farm (36.8 MW)

General Contractor of energy works including construction of a HV/MV substation, HV cable line, MV and fibre wire lines, creation and start-up of telecommunications systems.

Korsze Wind Farm (70 MW)

Design of the power compensation system consisting of capacitor banks and chokes (construction design – including provision of all necessary permits to start the works – and execution design). Execution of this system, including the supply of compensation equipment, construction of foundations, modernisation of the substation facility, land development, expansion of the MV switchgear, modernisation of the telemechanics system).

Rajgród Wind Farm (25.3 MW)

General Contractor of energy works including construction of a HV/MV substation, HV cable line, MV and fibre wire lines, creation and start-up of telecommunications systems.

Gawłowice Wind Farm (41.4 MW)

General Contractor of energy works including construction of a HV/MV substation, MV and fibre wire lines, creation and start-up of telecommunications systems.

Radysy Find Farm (47.5 MW) – construction design

Comprehensive development of a construction design for the Radysy Wind Farm (HV/MV substation, HV cable line, MV and fibre wire lines, access roads and erection sites) and provision the building permit.

Iłża Wind Farm (75 MW)

Development of a detailed construction design for a 110/30 kV, 63 MVA transformer station, turnkey construction of the substation, redevelopment of the 110 kV overhead line, preparation of connection plans for PGE Dystrybucja S.A. Skrarżysko-Kamienna Unit and PSE Operator S.A., along with the supply of equipment and system start-up.

Zopowy Wind Farm (30 MW)

Comprehensive, turn-key construction of a 110/30 kV 40 MVA substation. Design, execution and start-up of green energy measurement systems in 15 WTGs, including supply, installation and start-up of a complete measurement system. Design, execution and start-up of a communication system with PSE Operator S.A. And Tauron Dystrybucja S.A. Conduction of compliance tests on the Wind Farm, in accordance with IRiESD requirements (Polish Distribution Grid Code), including the so called energy quality tests (in progress).