![](https://concreo.electrum.pl/wp-content/uploads/2022/02/andrew-schultz-427097-unsplash-scaled.jpg)
Date of implementation
2015
110/30 kV substation, 110 kV cable line with a detailed construction design of the 110 kV bay in a PGE Dystrybucja S.A. substation.
110/30 kV substation, 110 kV cable line with a detailed construction design of the 110 kV bay in a PGE Dystrybucja S.A. substation.