![](https://concreo.electrum.pl/wp-content/uploads/2022/02/DSC01866-2-scaled.jpg)
Date of implementation
2014 - 2015
110/10 kV switchgear modernisation, electrical and low voltage installations, automation and control system within the construction of a surface air-conditioning station and power generation unit. Production of design documentation for the project.