“Rudna” copper mine – modernisation of a 110/10 kV switchgear and installation of a trigeneration system

Date of implementation

2014 - 2015

110/10 kV switchgear modernisation, electrical and low voltage installations, automation and control system within the construction of a surface air-conditioning station and power generation unit. Production of design documentation for the project.