Comprehensive design and installation of the telemechanics system in the HV/MV substation.
Kategoria projektu: Energy and Power Engineering
Wasilków 110/15 kV substation – modernisation
Comprehensive execution of the telemechanics system in an HV/MV, replacement of energy protection systems.
Comprehensive execution of the telemechanics system in an HV/MV, replacement of energy protection systems.
Comprehensive execution of the telemechanics system in the HV/MV substation.
Wyszków2 110/15 kV substation
Comprehensive execution of the telemechanics system in an HV/MV, replacement of energy protection systems.
Modernisation of a 110/15 kV District Supply substation 8 in Białystok
Comprehensive execution of the telemechanics system in an HV/MV, replacement of energy protection systems.
Dynamic Line Rating (DLR) measurement system for the 110 kV line within the area managed by PGE Dystrybucja S.A. Białystok Unit (smart grid element)
Development of design and technical documentation including: preparation of the design and technical documentation with a photo inventory, laser scanning and digitalisation of the 110 kV line, overhead line sag measurements with line ratings, temperature and weather conditions (exposure to sunlight, cloud cover, wind speed), report on power line spans with excessive sag with necessary documentation, longitudinal sections of the 110 kV line. Supply and installation of temperature monitoring equipment for the 110 kV line, integration of the temperature monitoring system with SCADA, start-up of installed devices, performance tests, measurements.
Adamowo 110/15 kV substation – modernisation
Comprehensive modernisation of the telemechanics system in the HV/MV substation.
Modernisation of a 110/20 kV Reja substation in Suwałki
Comprehensive execution of the telemechanics system in the HV/MV substation.
Banie Mazurskie 110/15 kV substation
Comprehensive detailed construction design for a 110/15 kV substation in Banie Mazurskie, including provision of a binding building permit. Comprehensive detailed construction design for 110 kV line in leads in Banie Mazurskie substation, including provision of a binding building permit.
Modernisation of a 110/15 kV ECB substation in Białystok
Modernisation of the 110/15 kV switchgear (high voltage and medium voltage bays) and electrical protection replacement. Expansion and modernisation of the substation building, installation of a telemechanics systems, connection of dispatching systems of Elektrociepłownia Białystok (Microscada) and PGE Dystrybucja S.A. (BTC PRINS).