Taczalin Wind Farm (45.1 MW)

Date of implementation

2012 - 2013

Preparation of a detailed construction design, installation of 30 kV MV cable lines and fibre wire lines between the WTGs and the 110/30 kV Taczalin substation, HV and fibre wire line between the Taczalin substation and Górka substation.