Date of implementation
2012
Production of an alternative construction design and a detailed construction design of a 110/30 kV 70 MVA transformer station (turn-key contract), construction of the transformer station; execution of connectivity projects with ENEA Operator S.A. And PSE Operator S.A., along with the supply and start-up of the system. Design, execution and start-up of green energy measurement systems in 11 WTGs, along with the supply, installation and start-up of the complete measurement system. Coordination of the Wind Farm’s start up.