Taczalin Wind Farm (45.1 MW)

Preparation of a detailed construction design, installation of 30 kV MV cable lines and fibre wire lines between the WTGs and the 110/30 kV Taczalin substation, HV and fibre wire line between the Taczalin substation and Górka substation.

Krobia 1 Wind Farm (33 MW)

Production of an alternative construction design and a detailed construction design of a 110/30 kV 70 MVA transformer station (turn-key contract), construction of the transformer station; execution of connectivity projects with ENEA Operator S.A. And PSE Operator S.A., along with the supply and start-up of the system. Design, execution and start-up of green energy measurement systems in 11 WTGs, along with the supply, installation and start-up of the complete measurement system. Coordination of the Wind Farm’s start up.

ECB – Construction of a 6 kV switchgear for the K-6 biomass boiler.

Construction of the Switchgear 1 building for the MV switchgear, comprehensive execution of electrical installations, supply, installation, connection and start-up of a 10-bay separate compartment MV switchgear, execution of connection and communication between the ABB SCS100 system and ETNA meter readout system, expansion of the systems and illustration of the systems on a synoptic board in the NPO control room.

Taciewo Wind Farm (30 MW)

Comprehensive, turn-key construction of a 110/20 kV 40 MVA substation. Design, supply and start-up of green energy measurement systems in 15 WTGs, along with the supply, installation and start-up of the complete measurement system. Execution of 20 kV MV and fire wire lines (approx. 25 km), Design, execution and start-up of a connectivity system with PSE Operator S.A. and PGE Dystrybucja S.A. Białystok Unit. Conduction of compliance tests on the Wind Farm, in accordance with IRiESD requirements (Polish Distribution Grid Code), including the so-called energy quality tests.

Piecki Wind Farm (32 MW)

Comprehensive construction of a 110/20 kV substation. Reconstruction of the 110 kV line and cable lead-ins into the substation. Design, execution and start-up of a connectivity system with PSE Operator S.A. and PGE Dystrybucja S.A. Białystok Unit. Design, supply and start-up of green energy measurement systems in 16 WTGs, along with the supply, installation and start-up of the complete measurement system. Conduction of compliance tests on the Wind Farm, in accordance with IRiESD requirements (Polish Distribution Grid Code), includig the so called energy quality tests.

Wronki Wind Farm (48 MW)

Development of a detailed construction design for a 110/20 kV substation. Comprehensive modernisation of a 110/20 kV 2×40 MVA substation. Design, supply and start-up of green energy measurement systems, along with the supply, installation and start-up of the complete measurement system. Technical and legal support for the Investor in relation to cooperation and negotiations with PGE and PSE and communications companies. Conduction of compliance tests on the Wind Farm, in accordance with IRiESD requirements (Polish Distribution Grid Code), includig the so called energy quality tests.

Dynamic line rating (DLR) monitoring

Development of detailed documentation for the execution of a line temperature monitoring system (110 kV line Grajewo1- Grajewo2, Biała Piska – Kolno, Ostrołęka – Nowogród, Łomża2 – Nowogród). Installation of complete measuring and weather equipment; integration of the monitoring system with PRINS.